 |  |
Square Footage: 224,540 sq. ft. Completion Date: 2003 |
 |
Scope of Work: Structural engineering Detailed Description: This 213,000 square foot 3 level parking garage consists of a structural
framing system with post-tensioned slabs. This steel frame design reduced
foundation costs significantly and went up faster, providing an attractive
alternative to an all-concrete structure. |  |  |